Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Number-of-issues-in-sprint-rolling-vs-all-KPI-Jira.png

Step 1: Add a Data Source. In our example, we’ve filtered our demo project ‘Aqua’ and disabled the date range to view all previous sprints.

Step 2: Select the ‘Number of Issues in Sprint’ metric.

Step 3: Choose ‘Sprint’ for the ‘Display by’ field to unlock additional filtering options for your ‘Number of Issues in Sprint’ metric and specify the Sprint Board you want to analyze.

Step 4: Return to the ‘Number of Issues in Sprint’ metric and choose criteria “Rolling”.

Step 5: Enable the Target section and select the “% Change” type.

Step 6: Choose the “Per x-axis” item target.

Step 7: Set the target to the desired percentage. In our example, this is 20%.

Step 8: Select “Number of Issues in Sprint” – “All” as the target metric.

Step 9: Specify that exceeding the target is considered “Bad”.

Number-of-issues-in-sprint-rolling-vs-all-KPI-Jira-settings.png

Panel
panelIconId1f3a5
panelIcon:movie_camera:
panelIconText🎥
bgColor#F4F5F7

Watch the video tutorial at our website: https://performance-objectivesdevacrobats.com/rolling-issues-vs-all-jira-kpi/

Here’s Step 4 in detail:

Rolling-issues-in-sprint.png