/
Percent Change Improvement Over Previous Period
Percent Change Improvement Over Previous Period
Step 1: Add two data sources filtering Resolved issues from two distinct time periods like on our sample - Data source A: Q4 Last year and Data source B: Q1 This year.
Step 2-3: For the default metric selection ‘Number of issues’ change the data source from All to B.
Step 4: Display by ‘Resolved’ by Week Index.
Step 5: Switch from Line to Area chart.
Step 6: Activate Target feature and choose ‘% Change’ type of target.
Step 7: Select Per x-axis item target results.
Step 8: Add target value and specify data source for the target metric - A.
Step 9: Under More Settings activate a Warning Threshold and add value.
Watch the video tutorial at our website: Period over Period comparison with Performance Objectives for Jira app
, multiple selections available,
Related content
Breached FRT vs Breached TTR vs Number of Issues
Breached FRT vs Breached TTR vs Number of Issues
Read with this
Average Satisfaction and SLA Time
Average Satisfaction and SLA Time
Read with this
Target Set as % Change of Metric
Target Set as % Change of Metric
Read with this
Sprint Scope Change
Sprint Scope Change
Read with this
Budgeted vs Actual Cost of Work
Budgeted vs Actual Cost of Work
Read with this
Basic Forecasting Report
Basic Forecasting Report
Read with this