Net Flow of Requests

Net-flow-of-requests-report-jira-range-date-feature.png

 

 

Step 1: Add the first data source. In our sample case, this is ‘Created’ issues for a designated period.

Step 2: Add a second data source, depicting ‘Resolved’ issues for the same matching period as in data source A.

Step 3: Opt for Formula metric calculation.

Step 4: Add parameters. In our case P1 = Number of issues from Data Source A (Created), P2= Number of issues from Data source 2 (Resolved)

Step 5: Type the (P2-P1) formula equation.

Step 6: Set a custom name for your newly created formula metric.

Step 7: Choose the ‘Range Date’ field for ‘Display by.’ This field synchronizes all date values from the selected date fields within your data sources. In our case, we have chosen ‘Date by – Week.’

Step 8: Optionally, switch from Line to Area chart view.

 

Net-flow-of-requests-report-jira-range-date-feature-settings.png

Access additional configuration screens for detailed information on steps 1 and 2:

 

 

 

 

Step 4 in details: